School Board reviews plans for new gymnasium
The Bedford School Board reviewed preliminary architect drawings from DLR for a new gymnasium, approved a trip for FFA students to attend the national convention, and approved disposal of obsolete equipment at the September 14 board meeting.
Representatives of DLR reviewed preliminary plans for a new gymnasium at two different locations. One location is south of the school and the second location is at the football/track complex. The drawings are a first look at how the gymnasium would be laid out and are not final plans.